
Claude Road
Through VURB pathway, glazing cost was reduced by increasing U-value from U2.8 to U3.5. This was achieved by adding 33% more insulation to the walls and 20% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-02-14T04:14:40+00:00
Middle Tarwin
Through VURB, overall window U-values increased from U2.3 to U2.9. Also, feasibility study showed best results for bore water geothermal.