Devonport
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.3 to U3.9 while keeping the existing windows from being replaced. This was done by adding 37% more insulation to the roof/ceiling, 45% more insulation to the external floor, slab edge insulation and roof blankets.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
South Windsor
We were assigned to this project to investigate whether the project's bedrooms achieve adequate daylight access
North Melbourne
Through VURB, we were able to achieve compliance by having windows with an overall U-value of U3.3 (a 27% increase)
Porcupine Ridge
Using VURB pathway, we managed to reduce overall glazing U-values from U2.1 to U2.7
Kogarah bay
The main BASIX commitments included high-efficiency cooling system, rainwater tank, water-efficient fixtures and heat pump water heater