A 3D image of our VURB and feasibility assessment project at Torquay

Torquay

Through the Elemental approach, Torquay project upper floor glazing required U-value is calculated to be U1.29. Through VURB, The upper floor glazing area could be kept the same as architectural plans without a significant increase in glazing costs. We managed to obtain energy compliance for the glazing with an average U-value of 2.45.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:33+00:00

Marengo

After several iterations for optimisation, we managed to increase the overall U-values from U2.7 to U3.8 (a 40% increase).

2025-01-30T08:37:47+00:00

Tuerong

With Deemed to Satisfy provisions and adjustable shading devices we managed to increase the overall U-values from U2.1 to U2.4 (a 15% increase).