Bell Buoy Beach

Through VURB pathway, glazing cost was reduced by increasing U-value from U3.0 to U3.5. This was achieved by adding 38% more insulation to the walls and 26% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-02-10T02:17:49+00:00

Selby

Through VURB and with a minor amendment, we managed to increase the overall U-values from U3.0 to U3.9 (more than a 30% increase).

2023-02-14T04:28:05+00:00

Tuerong

With Deemed to Satisfy provisions and adjustable shading devices we managed to increase the overall U-values from U2.1 to U2.4 (a 15% increase).