Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing averaged U value from U3.8 to U2.4 and by adding 12% more insulation to the walls and 6% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-06-19T05:24:26+00:00
South Windsor
We were assigned to this project to investigate whether the project's bedrooms achieve adequate daylight access
Amir2022-02-13T21:37:55+00:00
Mornington
Through VURB pathway, glazing cost was reduced by increasing U-value from U1.9 to U2.5