Flinders

Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.0 to U3.4.
This was done by adding 10% more insulation to the roof/ceiling, 5% more insulation to the external floor, walls and 3 shading devices.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:33+00:00

Marengo

After several iterations for optimisation, we managed to increase the overall U-values from U2.7 to U3.8 (a 40% increase).

2023-02-10T02:17:49+00:00

Selby

Through VURB and with a minor amendment, we managed to increase the overall U-values from U3.0 to U3.9 (more than a 30% increase).