Balaclava

Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U2.5 to U1.6 and by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-02-10T02:52:44+00:00

Elwood

Through VURB pathway, we were able to have an overall U-value of U3.5 instead of 3.0 (6 stars from NatHERS).

2023-02-14T06:47:54+00:00

Newham

Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.4 to U3.0