
Pakenham
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.5 to U3.2. This was done by adding 20% more insulation to the walls, 37% more insulation to the roof/ceiling, proposed shading devices and R1.2 slab insulation to parts of the building.
Please click here for more details on VURB Performance Solution.